Construction of a baby food workshop for DANONE Ukraine
The construction of the main production building №2 for the manufacture of baby food on the premises of the Kremenchuk City Dairy Plant has enabled the processing of 15,000 tonnes of milk and the production of 7,400 tonnes of finished products annually. As part of this project, a full range of construction and installation works was carried out, along with landscaping of the site.
During the construction of the facility, a number of measures were implemented to achieve energy efficiency, automated equipment was installed, and provisions were made for its protection.
