Industrial and warehouse complex for DKS Ukraine
Completed as a part of DKS Ukraine CJSC project to launch second production facility for electrical and data networks laying systems (PVC and polyethylene), the works included: erecting production and warehouse facility; setting up parking space for trucks and cars; building a storage area for double wall pipes ready for shipment.
Scope of work:
- preparatory work;
- construction of underground and surface parts of the building;
- laying out external engineering networks incl. power supply, water supply and sewerage;
- beautification of the territory.
Construction area – 4,000 m2.