Artbudservice > Facilities > Overhaul of the second Donetsk water pipeline under UNICEF project

Overhaul of the second Donetsk water pipeline under UNICEF project

The second Donetsk water supply (the second thread) was put into operation in 1979. 40 years of operation of the water supply system led to a significant deterioration of its condition, which leads to frequent gusts and stops in work to eliminate currents. During major repairs, a significant part of settlements that are direct consumers are left without drinking water.

Construction and installation works, hydraulic tests were carried out, as well as a new site was cut into the existing water supply. As a result of the implementation of this project, residents of the surrounding villages and towns will be able to feel the smooth operation of the second Donetsk water supply system, due to a significant improvement in its performance.

Total length of the pipeline: 550.50 m